REMOVAL
PROCEDURE
1. REMOVE REAR CONSOLE UPPER PANEL
Click here
2. REMOVE LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL
Click here
3. REMOVE LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL
Click here
4. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY
Click here
5. REMOVE INSTRUMENT CLUSTER FINISH PANEL ORNAMENT
Click here
6. REMOVE CONSOLE PANEL SUB-ASSEMBLY
Click here
7. REMOVE CONSOLE BOX ORNAMENT
| (a) Remove the 2 screws and console box bracket. |
|
| (b) Remove the 4 screws and console box ornament from the shifting hole frame sub-assembly. |
|
8. REMOVE COMBINATION SWITCH ASSEMBLY
| (a) Remove the 3 screws and combination switch assembly from the console box ornament. |
|
InspectionLexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Door Control Receiver: Removal
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during electrical key and tire pressure warning ECU and receiver removal/installation are shown below. Necessar ...
Lexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Fuel System: On-vehicle Inspection
ON-VEHICLE INSPECTION PROCEDURE 1. CHECK FUEL PUMP OPERATION AND INSPECT FOR FUEL LEAK (a) Check fuel pump operation. (1) Connect the Techstream to the DLC3. (2) Turn the engine switch on (IG). NOTICE: Do not start the engine. (3) Turn the Techstream on. (4) Enter the following menus: Powertrain / E ...