INSTALLATION
PROCEDURE
1. INSTALL HEADUP DISPLAY SWITCH ASSEMBLY (INTEGRATION CONTROL AND PANEL ASSEMBLY)
(a) Engage the 4 claws as shown in the illustration to install the headup display switch assembly (integration control and panel assembly).
| Install in this Direction |
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
Click here
3. CONNECT HOOD LOCK CONTROL LEVER SUB-ASSEMBLY
Click here
4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Click here
5. INSTALL COWL SIDE TRIM BOARD LH
Click here
6. INSTALL FRONT DOOR SCUFF PLATE LH
Click here
7. INSTALL INSTRUMENT PANEL GARNISH LH
Click here
InspectionLexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Air Conditioning System: Back-up Power Source Circuit
DESCRIPTION The back-up power source circuit for the air conditioning amplifier assembly is shown below. Power is supplied even when the engine switch is off. This power is used for diagnostic trouble code memory, etc. WIRING DIAGRAM CAUTION / NOTICE / HINT NOTICE: Inspect the fuses for circuits re ...
Lexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Lighting System: System Diagram
SYSTEM DIAGRAM ...