INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
| (a) Measure the resistance according to the value(s) in the table below when the transmission control shaft lever is moved to each position. Standard Resistance:
If the result is not as specified, replace the park/neutral position switch assembly. |
|
Removal
AdjustmentLexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Air Conditioning System: PTC Heater Circuit
DESCRIPTION The air conditioning amplifier assembly sends operation signals to the PTC heater relays when quick heater assembly operation conditions are met. Based on the signals from the air conditioning amplifier assembly, the PTC heater relays turn on, and power is supplied to the quick heater as ...
Lexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Can Communication System: Open in Bus 2 Main Bus Line
DESCRIPTION There may be an open circuit in one of the bus 2 main lines when the resistance between terminals 18 (CA4H) and 17 (CA4L) of the network gateway ECU is 70 Ω or higher. Symptom Trouble Area Resistance between terminals 18 (CA4H) and 17 (CA4L) of network gateway ECU is 70 Ω or h ...