ON-VEHICLE INSPECTION
PROCEDURE
1. SECURE VEHICLE
(a) Fully apply the parking brake and chock a wheel.
CAUTION:
2. INSPECT SHIFT LEVER POSITION
(a) When moving the shift lever from P to R with the engine switch on (IG) and the brake pedal depressed, check that the shift lever moves smoothly and correctly into position.
(b) Start the engine and check that the vehicle moves forward when the shift lever is moved from N to D and moves rearward when the shift lever is moved to R.
If the operation is not as specified, inspect or adjust the park/neutral position switch assembly or transmission control cable assembly.
3. INSPECT SHIFT LOCK OPERATION
(a) Move the shift lever to P.
(b) Turn the engine switch off.
(c) Check that the shift lever cannot be moved from P to any other position.
(d) Turn the engine switch on (IG), depress the brake pedal, and check that the shift lever can be moved to another position.
If the operation is not as specified, inspect the transmission floor shift assembly.
Click here
4. INSPECT SHIFT LOCK RELEASE BUTTON OPERATION
(a) Move the shift lever to P.
(b) Turn the engine switch off.
(c) Remove the shift lock release button cover.
Click here
(d) When moving the shift lever with the shift lock release button pressed, check that the shift lever can be moved from P to any other position.
Components
DisassemblyLexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Center Power Outlet Socket (for Console Box Front Side): Installation
INSTALLATION PROCEDURE 1. INSTALL NO. 2 POWER OUTLET SOCKET COVER (a) Engage the 2 claws to install the No. 2 power outlet socket cover as shown in the illustration. Install in this Direction 2. INSTALL NO. 2 POWER OUTLET SOCKET ASSEMBLY (a) Engage the claw to install the No. 2 power outle ...
Lexus RX (RX 350L, RX450h) 2016-2026 Repair Manual > Meter / Gauge System: Precaution
PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable from the negative (-) battery terminal, initialize the following systems after the cable is reconnected. System Name See Procedure Lane Control System Pre-collision Sys ...