ADJUSTMENT
PROCEDURE
1. SECURE VEHICLE
(a) Fully apply the parking brake and chock a wheel.
CAUTION:
2. REMOVE COOL AIR INTAKE DUCT SEAL
Click here
3. REMOVE INLET AIR CLEANER ASSEMBLY
Click here
4. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
5. REMOVE BATTERY
Click here
6. DISCONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Click here
7. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Disconnect the park/neutral position switch assembly connector. | |
(b) Remove the nut and transmission control shaft lever from the manual valve lever shaft sub-assembly.
(c) Loosen the 2 bolts of the park/neutral position switch assembly. | |
(d) Align the protrusion with the neutral basic line. |
|
(e) Hold the park/neutral position switch assembly in position and tighten the 2 bolts.
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
(f) Install the transmission control shaft lever to the manual valve lever shaft sub-assembly with the nut.
Torque:
16 N·m {163 kgf·cm, 12 ft·lbf}
(g) Connect the park/neutral position switch assembly connector.
8. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Click here
9. INSTALL BATTERY
Click here
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here
11. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
12. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
13. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION
Click here
Lexus RX (RX 350L, RX450h) 2016-2024 Repair Manual > Cornering Light Assembly: Inspection
INSPECTION PROCEDURE 1. INSPECT CORNERING LIGHT ASSEMBLY LH (FOG LIGHT ASSEMBLY LH) (a) Apply battery voltage to the cornering light assembly LH (fog light assembly LH) and check that the light comes on. OK: Condition Specified Condition Battery positive (+) → Terminal 1 (B) and Termi ...
Lexus RX (RX 350L, RX450h) 2016-2024 Repair Manual > Automatic High Beam Main Switch: Installation
INSTALLATION PROCEDURE 1. INSTALL AUTOMATIC HIGH BEAM MAIN SWITCH ASSEMBLY (INTEGRATION CONTROL AND PANEL ASSEMBLY) (a) Engage the 4 claws to install the automatic high beam main switch assembly (integration control and panel assembly) as shown in the illustration. Install in this Direction ...