INSPECTION
PROCEDURE
1. INSPECT ENGINE SWITCH
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the engine switch. |
|
(b) Apply battery voltage between the terminals of the engine switch, and check the illumination condition of the engine switch indicator light.
OK:
Condition | Specified Condition |
---|---|
Battery positive (+) → Terminal 9 (SWIL) Battery negative (-) → Terminal 6 (AGND) | Illuminates |
HINT:
If the result is not as specified, replace the engine switch.
Lexus RX (RX 350L, RX450h) 2016-2024 Repair Manual > Towing Converter Relay: Removal
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during towing converter relay removal/installation are shown below. Necessary Procedure After Parts Removed/Ins ...
Lexus RX (RX 350L, RX450h) 2016-2024 Repair Manual > Steering Wheel: Removal
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the steering wheel assembly removal/installation are shown below. Necessary Procedure After Parts Removed/ ...